Project name | Akasaka Intercity AIR |
---|---|
Location | Part of 5, 6, 8, and part of 9, Akasaka 1-Chome, Minato-ku, Tokyo |
Transportation | Directly connected via underground passage to Tameike-sanno Station on the Tokyo Metro Ginza and Namboku Lines (connected to the Tokyo Metro Chiyoda and Marunouchi Lines at Kokkai-gijidomae Station) |
Main uses | Offices, apartment complex, meetings and conferences, retail stores, etc. |
Site area | 16,088.32m2 |
Total floor space | 178,328.01m2 |
Height | 205.08m(TP+214.23m) |
No. of floors | 38 floors above ground (penthouse: 1), 3 underground floors; |
Structure | Steel structure, steel-reinforced concrete structure, and reinforced concrete |
Seismic control system | Buckling restrained brace (unbounded brace), Tuned Viscous and Mass Dampers, Viscous Damping Device with Amplifying Mechanism |
Elevators | Office lower-level: 8; mid-level: 8; upper-level: 8; emergency-use: 2; other: 11 (37 in total) |
Parking lot spaces | 314 spaces (self-parking: 132 spaces; mechanical parking system: 182 spaces) |
Completion Date | August 2017 |
Project owner | Akasaka 1-chome Redevelopment Association |
Design and supervision | Nihon Sekkei, Inc. |
Construction contractor | Obayashi Corporation |
2. Equipment Outline
Power receiving system | Special high-voltage 22KV, three-line spot network system |
---|---|
Distribution system | Electric lamp: single-phase, three-wire system
200V/100V Power socket: single-phase, three-wire system 200V/100V |
Electricity capacity upgrade | Spare systems can be added in the electrical rooms |
Emergency power source | Dual fuel gas turbine power generators 3,500kVA x2 units (Fuel: heavy oil for 72 hours; medium pressure gas for 200 hours of continuous operation is possible) |
Space for power generator for tenants | Dual fuel gas turbine power generators 2,000kVA x1 unit (Fuel: heavy oil for 72 hours; medium pressure gas) Gas turbine type: 1,500VA x 2 units(Fuel: heavy oil for 72 hours) *Oil tank installed |
Shared TV reception equipment | UHF, BS, CS, CATV deployment possible (equipped only with space for installation) |
Communications equipment | Installation planned (metal cables, optical cable) |
Space for IT use | Equipped with space for tenant-use antennae |
Air conditioning heat source system | District heating and cooling (DHC), Cogeneration system |
Air conditioning upgrade space | Equipment balcony placed on each floor |
Security | Security system with non-contact IC card reader |
3. Tenant Area Outline
Office floors | 6F to 37F (32 floors) |
---|---|
Total office leasable floor space | 82,006.03m2 |
Standard floor leasable floor space | 2,587.53 m2 *Leasable units within core available separately (37F/36F: 279.64 m2, 28F: 133.16 m2) |
Ceiling height | 2,850mm (special floors: 3,000mm) |
Raised floor | 150mm (special floors: 300mm) |
Floor loading | 500kg/m2 (heavy-duty zone: 1,000kg/ m2 ); special floors: 1,000kg/m2; leasable units within core: 500kg/m2 |
Power socket capacity | 60VA/m2 |
Lighting system | LED lighting (Grid-type ceiling system), standard illuminance 750lx |
Air conditioning equipment | Perimeter: multi duct air-conditioning system, 18 zones in 5 systems on each floor; interior: multi duct ventilation system, 26 zones in 5 systems on each floor |